This aggregate storage building required exterior insulation and, to withstand the daily wear and tear of caused by the aggregate loader, a durable finish inside. This building is an ideal application for the Logix XP-1 system. The Logix XP-1 wall construction took only 6 days in cold winter conditions. The sound deadening qualities of the concrete walls was also needed to reduce the daily noise from the loader, as this facility is located close to a residential neighborhood.
Completed 2019
AB
, Canada